MPI ASSEMBLY/TEST FACILITY

The project is a new Assembly/Test Facility on a seven (7) hectare site in Carmona, Cavite. Construction includes site development and buildings with a gross floor area of 16,700 square meters. Designed to accommodate multi-product manufacturing, the new facility consists of a Production Area (7,200 square meters.), a Support Facilities Area (5,800 square meters) and an Office Block (3,700 square meters).

As the Principal Consultant, RNFA provided design and construction management services covering Civil/Structural/Architectural, Plumbing/Sanitary, Mechanical (HVAC/Fire Protection/Process Utilities) and Electrical (Power and Communication).

PROJECT FACTS

Project Name MPI ASSEMBLY/TEST FACILITY

Location Carmona, Cavite

Owner/Client Motorola Philippines, Inc. (MPI)

Type of Facility Semiconductor Plant

Floor Area (m2) 16,700

Project Value US $ 18 M

RNFA Scope of Work Architectural/Engineering Design & Project Management Services

Date Completed January 1995

Monde Nissin Cebu Plant Expansion & Redevelopment

MNC’s Cebu Plant is located on a 2.5-hectare property in Mandaue City, Cebu. Less than half of the property was still vacant before this project was started. On the occupied part of the property are four (4) major structures; namely, Biscuits/Noodles Building, Wafer Building and two raw Material Warehouses at the rear.

PROJECT FACTS

Project Name MONDE NISSIN CEBU PLANT EXPANSION & REDEVELOPMENT

Location Mandaue City, Cebu

Owner/Client Monde Nissin Corporation

Type of Facility Food Processing Plant

Floor Area (m2) 17,600

Project ValueUS $ 6.5 M

RNFA Scope of Work Architectural/Engineering Design and Construction Management Support Services

Date Completed September 2008

 

IOM Community Center & Evacuation Center – Guiuan

In 2014, a year after a most powerful 315 kph typhoon Haiyan ( locally known as Yolanda) made landfall in Guiuan Eastern Samar in the Philippines, the International Organization for Migration (IOM) embarked on a program to build resilient facilities that provided for community protection during evacuation in times of disaster and subsequent recovery. These buildings are right-sized for the community population by selecting from two models, namely a 1,500 m2 or a 750 m2 built-up area. During normal times that do not require the building’s use as an evacuation center, its use is mainly as a community center for the locality

This project in Guiuan was IOM’s first Community Center & Evacuation Center designed together with RNFA. It is a 750 m2 two-storey reinforced concrete structure with structural steel roof framing. The building was designed to withstand winds of 320 kph and earthquake resistance to meet seismic zone 4. Water storage was also incorporated in the facility as part of provisioning for recovery and rehabilitation. Many of the concepts adopted in the design of this facility were taken from the lessons learned in post-disaster studies of typhoon Haiyan.

On April 19, 2016, IOM’s completed Community Center & Evacuation Center was turned over to the Guiuan municipal government and to the community at large in a handover ceremony.

PROJECT FACTS

Project Name IOM Community Center & Evacuation Center – Guiuan

Location Guiuan, Eastern Samar

Owner/Client International Organization for Migration

Type of Facility Evacuation Center/Community /Center

Floor Area (m2)  750

Project ValueUS $ 330,000

RNFA Scope of Work Architectural/Engineering Design Services

Date Completed April 2016

NEW INTEL A2 BUILDING

This project involved the construction of a 5-storey building on a 4,500 square meters lot adjacent to the existing Intel A2 Facility. The building, with a floor area of approximately 25,000 square meters houses Intel’s expanded manufacturing operations as well as other offices. A portion of its roofdeck is used as a canteen and multi-purpose area, while the basement services parking.

An early completion date influenced the choice of structural steel framing in the design of the building.

The power center is a 4-MVA substation located at the ground floor; while two standby gensets in the basement provided back-up power. The chillers and pumps of the central A/C chilled water system (1300-TR capacity) are likewise to be found in the basement, while the cooling towers are on the roofdeck.
RNFA provided a Feasibility Study and the detailed Engineering/Architectural design services which cover the following disciplines: Civil /Structural/Architectural, Plumbing/Sanitary, Mechanical (HVAC and Fire Protection) and Electrical (Power and Communication).

PROJECT FACTS

Project Name New Intel A2 Building

Location 221 Apolinario Street, Bangkal, Makati City, Philippines

Owner/Client INTEL Philippines Manufacturing, Inc.

Type of Facility Semiconductor Plant

Floor Area (m2)25,000

Project Value US $ 175 M

RNFA Scope of WorkArchitectural/Engineering Design Services

Date Completed April 1995

 

HADSYS PLANT

Primarily due to an expansion in their output, Hadsys Philippines Corporation, a sister company of Honda Philippines, decided to move out of Phase I of LTI and put up their own plant at Phase IV of the LTI Sta. Rosa, Laguna. This new warehouse type plant was built to handle the production on the air-intake manifold and the assembly of the air condtioning units for local vehicles as well as for export purposes.

The plant site is approximately 25,000 square meters. On the other hand, the building floor area covers 4,623 square meters. The building itself is divided into two major sections, namely: the production area (3,522 square meters) and the office area (1,101 square meters).

RNFA’s services for this project started from design conceptualization all the way up to the actual construction management. From the start of rough grading work up to the completion of the facility, the construction period took 11 months.

PROJECT FACTS

Project Name HADSYS PLANT

Location Laguna Technopark, Inc. (LTI), Sta. Rosa Laguna

Owner/Client HADSYS Philippines Corporation

Type of FacilityManufacturing Plant

Floor Area (m2) 25,000

Project Value US $ 1.57 M

RNFA Scope of Work Architectural/Engineering Design & Project Management Services

Date Completed April 1999

 

GOTOH PHILIPPINES PLANT

Gotoh Philippines Corporation, a subsidiary of the Gotoh Manufacturing Company, Inc. of Japan, is engaged in the production of lead frames for semiconductor products. This plant in Carmelray provides 5,107 square meters of production area, auxiliary facilities, a canteen and offices on a 2.2 hectare property.

PROJECT FACTS

Project Name GOTOH PHILIPPINES PLANT

Location Carmelray Industrial Park, Canlubang, Laguna

Owner/Client Gotoh Philippines Corporation

Type of Facility Manufacturing Plant

Floor Area (m2) 5,107

Project Value US $ 6.4 M

RNFA Scope of Work Architectural/Engineering Design & Project Management Services

Date Completed August 1996

 

GLOBE TELECOM MANDALUYONG MSC EXPANSION

This Host Exchange building is a three storey structure covering a floor area of 2,400 sqm. It was built in order to meet the landline needs of the Marikina area, as well as to cater to GLOBE’s cellphone group. The ground floor switching room serviced the operations of the said company’s landline group, while the one on the 2nd floor attended to its mobile phone department. And the 3rd floor serves as an office expansion for both groups.

RNFA provided A/E Design and Construction Management support.

PROJECT FACTS

Project Name GLOBE TELECOM MANDALUYONG MSC EXPANSION

Location 2/F Pioneer Corporate Center, Madison St., Mandaluyong City

Owner/Client GLOBE Telecom

Type of Facility Owner Mobile Switch Center

Floor Area (m2) 3,035

Project Value Php 42 M

RNFA Scope of Work Architectural/Engineering Design & Project Management Services

Date Completed May 2000

DIC PHILIPPINES, INC. PRODUCTION & OFFICE BUILDING

On December 30, 2012, the entire Production and Office Building of DIC Philippines, Inc. (DIC) was damaged by fire. To continue with the business operations, DIC commissioned RN Ferrer & Associates, Inc. (RNFA) as A/E Design and Construction Management of the project.

The mission was to build a better facility with improved working and safety conditions as primary requirement of DIC.

PROJECT FACTS

Project Name DIC PRODUCTION AND OFFICE BUILDING

Location Bagumbayan, Tanyag, Taguig City

Owner/Client DIC Phils., Inc.

Type of Facility Manufacturing Plant

Floor Area (m2) 1,739

Project Value Php 41 M

RNFA Scope of Work Project Management

Date Completed August 2014

 

BBDO GUERRERO OFFICE RENOVATION AND FIT-OUT

This Project brought together a team to undertake the design, construction, fit-out and commissioning of a new office for BBDO Guerrero. The said office occupies two quadrants at the 17th floor and the entire 18th floor of Frabelle Building in 111 Rada St. Legaspi Village, Makati City. Provided with a total floor area of 1,150 sq. Meters, the creative firm, BBDO Guerrero acquired a new home.

RNFA was engaged to provide project management covering design, construction and commissioning of interior finishes and engineering works, and fit-out of office furniture and appliances.

PROJECT FACTS

Project Name BBDO GUERRERO OFFICE RENOVATION AND FIT-OUT

Location Frabelle Building in 111 Rada St. Legaspi Village, Makati City

Owner/Client BBDO Proximity Philippines

Type of Facility Office

Floor Area (m2) 1,150

Project Value Php 28 M

RNFA Scope of Work Project Management

Date Completed March 2015

AAPI AREA 5 FACILITY

Amkor Anam Philippines, Inc. (AAPI) is a semiconductor company engaged in assembling electronic components. To expand their P1 Facility operation, they decided to convert two (2) old warehouse buildings with a combined area of 6,000 square meters into a 12,000square meter assembly/test facility. They doubled the total area of the said facility by adding a second floor.

A two-storey structure was added in front in order to house a lobby and some toilet facilities. Another structure was built at the back to serve as the housing of the power substation, chillers, and even more toilets. Subsequently, a two-storey annex was constructed along one side of the facility to serve as offices and the central lockers area.

RNFA provided total engineering and structural design services for the entire project and, in addition, the firm managed the construction for the central lockers annex and handled production fit-up. The success of this engagement led to more renovation, facility conversion and expansion projects for RNFA within the AAPI’s P1 Facility Compound.

PROJECT FACTS

Project Name AAPI AREA 5 FACILITY

Location NSC Compound KM 22 East Service Road, South Superhighway, Muntinlupa, Metro Manila, Philippines

Owner/Client AMKOR ANAM PHILIPPINES, INC.

Type of Facility Semiconductor Plant

Floor Area (m2) 36,000

Project Value US $ 12 M

RNFA Scope of Work Architectural/Engineering Design & Project Management Services

Date CompletedJune 1995